Jump to content

Photo

Manufacturing idea

- - - - -

  • Please log in to reply
7 replies to this topic

#1
Scalpel4

Scalpel4

    Senior Member

  • Member
  • 560 posts
  • WLM ID:scalpel4@hotmail.com
To add an element of realism, I have an idea. I believe IRL, manufacturers produce one type of plane on one assembly line, not multiple models on the same line. If I'm wrong, delete the thread. This leads to separate queues for each model. I know this will severely increase the number of aircraft queues, but it would help increase delivery rates. Perhaps this would be good for AE V3?

[Edited on 7/24/2005 by Scalpel4]

#2
AirKevin

AirKevin

    Air Kevin Captain

  • Member
  • 929 posts
  • WLM ID:AirKevin747@yahoo.com
  • AIM Screen Name:AirKevin747
  • Yahoo ID:AirKevin747
  • Website:http://airkevin747.tripod.com
I believe different planes are on different assembly lines. For example, the Boeing 747 and 777 are on 2 different assembly lines. However, the 777-200 and 777-300 are on the same assembly line (read a book that said that). So that's a good idea. Seems, though, that it could require a reset.

#3
StephenM

StephenM

    Senior Member

  • Member
  • 987 posts
  • WLM ID:srkm@eircom.net
  • Website:http://www.airlinemogul.com
Good idea, but as you said, for AE V3

#4
deltafan

deltafan

    Member

  • Member
  • 117 posts
It would cut wait time down a lot.

#5
miller22 (inactive)

miller22 (inactive)

    AE Developer

  • AE Developer
  • 607 posts
  • AIM Screen Name:AeProjectManager
  • Website:http://www.airlineempires.org
There are some integral reasons why this will be difficult, and we've wanted to do this for a while. Unfortunately there's a long list...

You know how it goes.

#6
galapagapop

galapagapop

    Senior Member

  • Member
  • 602 posts
Well would it be something like this:

A:

A300/A310= 2 per month + 10% backlog
A318/A319/A320/A321= 20 per month +15% of backlog
A330/A340=10 per month + 10% of backlog
A380= 2 per month + 10% of backlog


Something similar could be worked out for other lines

#7
galapagapop

galapagapop

    Senior Member

  • Member
  • 602 posts
Well would it be something like this:

A:

A300/A310= 2 per month + 10% backlog
A318/A319/A320/A321= 20 per month +15% of backlog
A330/A340=10 per month + 10% of backlog
A380= 2 per month + 10% of backlog


Something similar could be worked out for other lines

#8
Scalpel4

Scalpel4

    Senior Member

  • Member
  • 560 posts
  • WLM ID:scalpel4@hotmail.com

Originally posted by miller22
There are some integral reasons why this will be difficult, and we've wanted to do this for a while. Unfortunately there's a long list...

You know how it goes.


Hey man, it's ALL good! Just an idea, if it's a pain then I understand. :cool:

[Edited on 7/26/2005 by Scalpel4]




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users