OK, this probably isn't as serious as the title suggests, but I would like a bit of assistance anyway.
I have a fledgling little airline based in Antananarivo, Madagascar, named Madagascar Air Lines. It is ranked 90th, and currently has a hard-working fleet of 3x Boeing 737-400s and 2x Boeing 737-700s, as well as a range of destinations all over Africa.
Now, there is a huge amount of potential here. The only problem is, I have reached my maximum amount of slots available in my single gate. Antananarivo - Ivato Airport has run out of gates, though, and in place of the "Lease Gate" button is a "Build Terminal" button. This is where it gets slightly messier.
Apparently, I cannot build a terminal unless it is at my hub, and I cannot build a hub unless I have leased 5 or more gates at the airport. As a result, I have one semi-idle 737-400, operating 7 hours a week and draining my finances. I cannot expand any more.
If you read through this whole thing, thank you. I probably made it sound so much more important than it really is, so if you can think of a solution (except for doing nothing and waiting, which is all I can think of now), that would be very much appreciated.