Time To Retrofit Cabin of Aircraft

- - - - -

  • Please log in to reply
10 replies to this topic

#1
Hillary Clinton

Hillary Clinton

    Hillary Rodham Clinton

  • Member
  • 216 posts

User's Awards

2   

[I Cannot find the request for time to retrofit cabins] When we retrofit the seats in plane, to make it realistic, can we have a period of time for retrofit before it can fly again? 


cc_orig.jpg


#2
the DOC

the DOC

    AE King

  • Member
  • 1,845 posts

User's Awards

2    3    4    3      
#AE4 (which may never come out in your lifetime but let's hope this answer satisfies your curiosity)

#3
Superman

Superman

    Data Collector

  • Data Collector
  • 1,507 posts

User's Awards

2    3   
I dont recall yuxi saying AE4 will have this feature

#4
KJS607

KJS607

    The O.G. Savage

  • Member
  • 3,860 posts
  • Website:https://www.thetravelsavage.com/

User's Awards

6       3   

I don't know whether it has been confirmed for AE4, but I reckon it will be.

 

#AE4

 

(AE needs hashtags)


msg-1341-0-50048700-1680446869_thumb.png

 

I did a thing: thetravelsavage.com

 


#5
Amadeus Inc.

Amadeus Inc.

    Group CEO, Amadeus Inc.

  • Member
  • 355 posts
  • Website:http://pilotamrik.blogspot.com

User's Awards

6    7    10    6    2   

indeed, i like it instant :P



#6
mxax-ai

mxax-ai

    OMGZ I LUUUUV AE!!!

  • Member
  • 585 posts

User's Awards

3    3      
Considering that the config can be changed in less than 24 hours IRL, I can agree that it should be instantaneous in AE.

#7
Yuxi

Yuxi

    AE Developer

  • AE Developer
  • 4,365 posts
Downtime for various maintenance tasks (like installing IFE, winglets, seats, etc) will be in AE 4. Whether the duration is fixed for each type of task or variable according to the capacity and labor availability at your maintenance bases will depend on how much micromanagement we will have regarding maintenance bases and scheduling. :P

#8
Amadeus Inc.

Amadeus Inc.

    Group CEO, Amadeus Inc.

  • Member
  • 355 posts
  • Website:http://pilotamrik.blogspot.com

User's Awards

6    7    10    6    2   

Downtime for various maintenance tasks (like installing IFE, winglets, seats, etc) will be in AE 4. Whether the duration is fixed for each type of task or variable according to the capacity and labor availability at your maintenance bases will depend on how much micromanagement we will have regarding maintenance bases and scheduling. :P

 

Oohh noo.. the end is coming  :alarm:



#9
LATAM

LATAM

    The neutral member

  • Member
  • 570 posts

User's Awards

      7   

but should these extra timings should be implemented all around AE then. Surely when building terminals (etc) there should be extra timings (AE days, months etc), but I don't agree with adding extended timings because it would slow down growth significantly because of the time that is lost waiting for these things to get built, fixed etc

dont agree with extending timings


post-80164-0-57964300-1517860417.png


#10
the DOC

the DOC

    AE King

  • Member
  • 1,845 posts

User's Awards

2    3    4    3      
But slowing growth is what we're trying to achieve...

#11
LATAM

LATAM

    The neutral member

  • Member
  • 570 posts

User's Awards

      7   

but somethings just take to long and the majority of people don't like waiting 1 month (AE time) for a terminal to be built, and if it took too long then people would just opt for gates until they cannot lease more, thus maybe stopping other smaller airlines from hiring gates. 


post-80164-0-57964300-1517860417.png