Jump to content

Photo

Uh oh...

- - - - -

  • Please log in to reply
44 replies to this topic

#1
Atlantic_Air

Atlantic_Air

    Senior Member

  • Member
  • 846 posts
  • Website:http://www.freewebs.com/atlantic_air/index.htm
Feb. 25th again :P:mad::(

#2
Timsher

Timsher

    Just a ling

  • Member
  • 573 posts
  • WLM ID:Timsher@gmail.com
  • Yahoo ID:Timsher19
:P :(

#3
Boy

Boy

    Member

  • Member
  • 53 posts
Oh dear. I keep on getting jacked of gates and money. Debt, Here i come. Cant afford to keep paying these gate charges O_O

[Edited on 11/28/2005 by Boy]

#4
CaptKornDog

CaptKornDog

    Senior Member

  • Member
  • 108 posts
Oh gosh....here comes the debt again indeed! Already lost 1 RNO gate, but thank goodness I got my 2 A320s rather than losing them =P

#5
TorqueWrench

TorqueWrench

    AE Luver

  • Veteran
  • 446 posts
This wont happen again next month, sorry guys... my fault...

#6
Boy

Boy

    Member

  • Member
  • 53 posts

Originally posted by TorqueWrench
This wont happen again next month, sorry guys... my fault...


It happens;)

BTW good job if you were the one to get rid of that guy with 1600 A380

#7
J

J

    Member

  • Member
  • 17 posts
OUCH!! I am getting charged 2 million extra on gates i don't even have???

I am going into debt!!! And it is now 26 February???

My gate charges have reached almost 4 million when they should only be 1 million???? What should I do??? What kinda bug is this??? Will it be corrected?

#8
Maestro69

Maestro69

    El Original Mod, AE Beta Tester

  • AE Moderator
  • 4,010 posts

User's Awards

3    3   
Right...

Please, everyone remain calm. Im sure the developers are looking into this matter and everything is under control. We may all have to live this for a while until this whole situation that has arising is fixed and AE working properly.

I too have been bit hard with gate costs, which im surely we will get compensated for ( i hope), but main priority would be to stay relax and let the developers do their job and fix this priority issue which made AE do this...

#9
highspeed

highspeed

    Junior Member

  • Member
  • 346 posts
Sure hope it does work out as it should. Looking at my rank it seems some are bitten harder than others...

#10
VC-10

VC-10

    Senior Member

  • Member
  • 706 posts
  • Website:www.freewebs.com/supervc10
Is says March 6 now.

#11
Willip

Willip

    Senior Member

  • Member
  • 198 posts
  • Website:http://whiox.mazca.com
hehe, never thought I'd see the day my gate leasing reached 100million :P

#12
highspeed

highspeed

    Junior Member

  • Member
  • 346 posts

Originally posted by VC-10
Is says March 6 now.

Yup. So far the damage seems to be two times gate leasing and two times hub expenses (both are charged three times, so limited to two too many). I'm not sure about fuel and payroll, I think this may just be me doing something wrong.

#13
Maestro69

Maestro69

    El Original Mod, AE Beta Tester

  • AE Moderator
  • 4,010 posts

User's Awards

3    3   
Only gate and hub costs were incurred 3 times i believe..... which would have put back a lot of people with high gate costs already!! :P:P:P

But, it seems everything is back on track, for the moment and money is flowing again, though the damage has been done already....

#14
highspeed

highspeed

    Junior Member

  • Member
  • 346 posts
It would be nice if the next two months we wouldn't be charged with hub and gate costs. Probably easier to do than to roll back the damage.

#15
Maestro69

Maestro69

    El Original Mod, AE Beta Tester

  • AE Moderator
  • 4,010 posts

User's Awards

3    3   
Thats a nice idea, highspeed..

Though, not sure if it is easier or not becuase all the costs incur would be within the AE code and to do what u ask, would need to be manuallly done, though, as im not a coder, im probably out of my field here.... :P

#16
highspeed

highspeed

    Junior Member

  • Member
  • 346 posts
It seems to me charging hubs and gates is a separate sql command or subroutine or whatever it is called. Chances are other end-of-month parts are setup the same. Therefore I guess there will be an overall end-of-month script that calls several of such subroutines; it is probably relatively easy to just make a copy of that, comment out the gate/hub part and run this instead of the real thing.

This is a guess. Maybe it is too much to ask. TorqueWrench can tell.

#17
mcminty

mcminty

    Member

  • Member
  • 47 posts

Originally posted by highspeed
It would be nice if the next two months we wouldn't be charged with hub and gate costs. Probably easier to do than to roll back the damage.



That would be a very nice idea. Im saying this cause I lost 5mil from gate and hub fees:mad:

#18
Maestro69

Maestro69

    El Original Mod, AE Beta Tester

  • AE Moderator
  • 4,010 posts

User's Awards

3    3   
mcminty, u may have lost 5 mil from gate and hub fees, but i lose nearly $200 mil in gate and hub costs, becuase of it been charged 3 times....

#19
StephenM

StephenM

    Senior Member

  • Member
  • 987 posts
  • WLM ID:srkm@eircom.net
  • Website:http://www.airlinemogul.com
Some of us lost 50mil.

#20
Airlaw

Airlaw

    Junior Member

  • Member
  • 6 posts
hmm had a 75 Mil increase in gates/hub cost! ouch that hurts




0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users