Jump to content

Photo

Interational Airport Redesign


  • Please log in to reply
6 replies to this topic

#1
Wagyu

Wagyu

    Cpt Wagyu

  • Member
  • 42 posts

If you had the keys to your international airport, how would you redesign it to be better?

 

EXAMPLE: LGAV Athens Airport

 

Attached File  Screen Shot 2019-01-09 at 12.21.17 am.png   669.79KB   3 downloads

 

redesigned to:

 

Attached File  PHASE 1.png   638.62KB   1 downloads

 

 



#2
Zacca

Zacca

    AE nostalgic member

  • Member
  • 1,738 posts

i'm pretty sure we made a roleplay about this before



#3
KJS607

KJS607

    The O.G. Savage

  • Member
  • 3,860 posts
  • Website:https://www.thetravelsavage.com/

User's Awards

6       3   

https://store.steamp...10/Airport_CEO/


msg-1341-0-50048700-1680446869_thumb.png

 

I did a thing: thetravelsavage.com

 


#4
TNT88

TNT88

    Hates Pedo

  • Member
  • 3,458 posts

User's Awards

2    14       71      

Add 10 more parallel runways and build 20 new terminal with 1000 gates combined.



#5
N664US

N664US

    Taking a break.

  • Member
  • 93 posts

Do y'all remember when the Avion Airport Replay Discord was still active? 


ISh4RPm.jpg

 

 


#6
Pasti

Pasti

    Fowl Play

  • Member
  • 1,032 posts

User's Awards

        

Do y'all remember when the Avion Airport Replay Discord was still active?


How ironic, I just left that server today.

siggie3.png


#7
PatriotsBruins&RedSox

PatriotsBruins&RedSox

    AE Player

  • Member
  • 83 posts

Boston 

-About to surpass 40 million passengers in a tightly confined space. 

-Most air gates are very utilized/at capacity.

-Demand in Boston is soaring, but limited space inhibits future growth of the city's airport.

-Terminal E expansion will contain about 10 new gates stretching the cargo side (North).

 

My Suggestion for Future Redesign

-Expand 33L about 1,500ft to handle larger aircrafts. Does not interfere with any Boston Harbor shipping routes, or MBTA Ferry services. However tall ships will have to relocate 700 feet outward, to comply with FAA Regulations.

-Expand Terminal A Airside by 10-12 gates, with relocating Delta/Fed Ex Cargo further south. 

-Possibly delete 14/32 Runway, limit and transfer civi aircraft service to Bedford Airport or Norwood Regional.

-In the future to meet demands at KBOS, provide a satleite terminal out by the satelite firehoue through underground people mover from Terminal C with infill of land. Very costly, but only if 12-20 gate satelite terminal needed desperately. 


MAL

 





0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users